Advantages of LED rental display.
Our rental led screen adopt the high brightness and viewing angle LED,it provides audience vivid image both in sunny outside and strong light inside,make audiences enjoy the marvelous visual feast with its natural color and high image resolution, high brightness and detailed display,it is applied in the exhibitions, conferences, performances and activities of video equipment. Suitable for indoor and outdoor all-day using.it can be connected to computers, cameras, DVD and VCD and other signal sources. It is already in production.
Features of Cabinet:
(1)Using new lifting design,fast installation.
(2) Achieve the unity of lifting beam and base,that is to say,when lifting beam used in hanging,it can be made use of lifting beams,when installed in the ground,it can be used as beam.No need to install brace below 4m (the height can be adjusted according to the size of cabinet), only the beam can support the led screen.Use resources effectively,reduce costs and solve the problem of fast installation.



Notes: This is the structure Chart. Parts in black are metal cube.
1: height of our cabinet 480mm, the green line is the virtual Position of the cabinet installation.
2: Width of our cabinet 480mm, the distance between two cores of two adjacent metal cubes.
3: The Metal cube on the bottom of the structure.requirements:40mm*40mm.surface smooth and in horizontal, without unevenness.
4: Square connect sheet, size: 70mm*70mm, install at the corner of cabinet.
5: Rectangular connect sheet, size: 70mm*25mm, install at the middle of cabinets.
6: It is a horizontal metal cube, Weld a horizontal metal cube every four cabinets’ height to make sure the screen is stable. The soldering position should be 60mm above the bottom line of 480mm*480mm cabinet.
Manunal of installation



1 The screen should be installed from the bottom of the structure,from the middle to both sizes,In order to keep the better effect of the led screen,please make sure that the gap between two cabinets can not be more than 1mm..
2 When finished,you can install the second row,installation is the same as the first row,but note that the cabinets from the second row should be locked in the enclosure slots which is from the first row,the gap between the first and the second row should not be more than 1mm..
3 And so on,the installation is the same as above till finish.